Millions of Square Meters

Dedictaed to Infra World

Shamrock GeoScience Range   Germany, leading Infrastructure Facilitation Company helping National Governments & Global Enterprises to Resource, Reuse, Recycle local soil & materials leaving green prints on roads, bridges, highways, railways, ports, cement, concrete or every user of soil...

Areas of Use

  • Road and Motorway construction
  • Harbour Premises and Wharfages
  • Cycle paths, Forest paths and agricultural roads
  • Construction of Runways
  • Access routes for the Oil, Gas, Steel and Wood industries
  • Dam reinforcements
  • General Foundations
  • Parking, Container Storage Points and
    Logistics Centres
  • Tunnel and sewage system construction
  • Biogas Plants
  • Biogas or other Storage areas
  • River Embankment Stabilization
  • Slope Reinforcements, Grouting
  • Rural or Village Roads
  • Storage areas for Wood, Metal, Minerals
  • Landfill Sites
  • Replacement of Depth Foundations
  • Railway tracks

Shamrock GeoScience Range -SM

Unique formulation or miracle product for Soil Modification, any soil type, Soil which has zero or negligible aggregates, leading to complete Solidification. An additive to be mixed in soil by mechanized recycler/ soil stabilizer, even a Ready Mix Cement plant! Tested & tried on more than 5.0 Mn. Sq. Mtrs world over. Lay as per road or pavement design leading to best in class ready to traffic roads. 100% Green Roads!!

  • Pic Mgmt

    Construction of Ampati-Purakhasia Road (28.00 km) under SPA Garohills-Meghalaya

    Surface: 1,46,025 m²
    Carried out: Oct. 2012
    Time needed: 4 Months
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Creation of Aggregate Less District Road of 30cm thick road pavement using Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer.

    Value: € 4.57Mn

  • Pic Mgmt

    Improvement Including widening to double lane on Songsak Mendipathar Road (from 12th-26 km) East Garo Hills-Meghalaya

    Surface: 85,000 m²
    Carried out: January 2012
    Time needed: 2 Months
    Milling depth: 30 cm
    Concrete: 170 kg / m³

    Task: Rehabilitation of old 2 lane state highway pavement using Shamrock GeoScience Range Composite technology as per specifications and directions of PWD Engineer in Charge.

    Value: € 1.88 Mn

  • Pic Mgmt

    Construction of Road from Betasing to Mellim West-Garo Hills-Meghalaya (15.360 km +3.21 km under SPA)

    Surface: 70,500 m²
    Carried out: March 2012
    Time needed: 3 Months
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Construction of India's First Aggregate Less District Road of 30cm thick road pavement using InfraCrete | Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer under SPA.

    Value: € 2.55 Mn

  • Pic Mgmt

    Strengthening & Improvement of Riding Quality East Garo Hills-Megahalaya on Songsak-Mendipather (40 km) upgradation

    Surface: 82,500 m² under execution
    Carried out: October 2014
    Time needed: 3 Months
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Creation of Aggregate Less composite pavement as per IRC standards of 30cm thick road pavement using Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer for State PWD under SPA.

    Value: € 2.35 Mn

  • Pic Mgmt

    Creation of the exterior area of a logistics centre for the Army of Sweden in Arboga

    Surface: approx. 90,000 m²
    Carried out: June / July 2009
    Time needed: ca. 8 weeks
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the creation of the exterior area of a logistics centre.

    Value: € 46.10 Mn

  • Pic Mgmt

    Rehabilitation of forest paths in Babimost / Poland

    Surface: A total of approx. 25,000 m²
    Carried out: June 2004
    Time needed: 2 weeks
    Milling depth: 25 cm
    Concrete: 160 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base layer and anti-frost layer for the forest paths used by vehicles transporting wood.

    Value: € 24.9 Mn

  • Pic Mgmt

    Construction of cycle paths in Suhr / Switzerland

    Surface: 22,000 m²
    Carried out: 2007
    Time needed: 1 week
    Milling depth: 25 cm
    Concrete: 170 kg / m³

    Task: Construction of a Shamrock GeoScience Range base and antifrost layer for areas used by cyclists. Created with nearnatural surfaces, without an additional asphalt layer.

    Value: € 12.10 Mn

  • Pic Mgmt

    Renovation of an agricultural road in Jalan Pekoti Timur / Malaysia

    Surface: 11 km
    Carried out: August 2006
    Time needed: 6 weeks
    Milling depth: 30 cm
    Concrete: 180 kg / m3

    Task: Rehabilitation of an agricultural road, which leads through a palm plantation and is used by heavy weight trucks.

    Value: € 4.9 Mn

  • Pic Mgmt

    Construction of a link road in the county of Biberach a. d. Riss / Germany

    Surface: approx. 15,000 m²
    Carried out: August 2009
    Time needed: 5 days
    Milling depth: 40 cm
    Concrete: 170 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road in Fischbach / Eberhardzell.

    Value: € 6.4 Mn

  • Pic Mgmt

    Construction of Kampung Bengang Aggregate Less Road

    Carried out: Year 2012-13
    Concrete: 220 kg/m3
    Client: JKR Sabah Min. of Forest Malaysia

    Task: Creation of 11 km District Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-SM

    Value: € 6.55 Mn

Shamrock GeoScience Range -ST

A Stabilizer for recycling of existing roads and rehabilitation of roads infrastructures. This additive modifies the hydration process of cement,where even crushed asphalt pavement can mixed into the new road base. The cement modifier increases the compressive strength and bending-tensile strength, parameters which are responsible for a longer lifetime,less maintenance and cost savings.

  • Pic Mgmt

    Road rehabilitation at the NK 107 in the county of Aargau / Switzerland

    Surface: approx. 2,500 m²
    Carried out: 24. + 25.07.2009
    Time needed: 24 hours
    Milling depth: 30 cm
    Concrete: 180 kg/m³

    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.

    Value: € 1.9 Mn

  • Pic Mgmt

    Creation of a link road between Glina and Topusco / Croatia

    Surface: approx. 12 km
    Carried out: April / May 2009
    Time needed: approx. 8 weeks
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.

    Value: € 31.8 Mn

  • Pic Mgmt

    Rehabilitation of a link road between two cities in Našièki / Croatia

    Surface: approx. 17 km
    Carried out: June / July 2009
    Time needed: approx. 8 weeks
    Milling depth: 30 cm
    Concrete: 160 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.

    Value: € 52.1 Mn

  • Pic Mgmt

    Creation of a highly frequented access road to a quarry in Zimmern / Germany

    Surface: approx. 5,000 m²
    Carried out: March 2009
    Time needed: 2 days
    Milling depth: 15 cm
    Concrete: 180 kg / m³

    Task: Creation of a Shamrock GeoScience Range ST base layer with used tarry road construction material for an access road (hundreds of trucks every day).

    Value: € 2.6 Mn

  • Pic Mgmt

    Operating road for the construction of the new ThyssenKrupp steel mill in Brazil

    Surface: approx. 8,000 m²
    Carried out: July 2008
    Time needed: 1 week
    Milling depth: 40 cm
    Concrete: 190 kg / m³

    Task: Creation of an Shamrock GeoScience Range base layer for an operating road which is used by heavy goods vehicles out of faint gritty, silty and clayey sand.

    Value: € 3.4 Mn

  • Pic Mgmt

    Rehabilitation of a district road in Unterlunkhofen / Switzerland

    Surface: approx. 7,500 m²
    Carried out: December 2006
    Time needed: Milling 2 days, road laying 4 weeks
    Milling depth: 25 cm
    Concrete: 190 kg / m³

    Task: Renovation of a link road, which would have taken 8 weeks (at times, completely closed) to complete using conventional building techniques

    Value: € 2.8 Mn

  • Pic Mgmt

    Rehabilitation of a district road in Osiek / Croatia

    Surface: 12,000 m²
    Carried out: September 2007
    Time needed: 5 days
    Milling depth: 30 cm
    Concrete: 180 kg / m³

    Task: Creation of a Shamrock GeoScience Range base and antifrost layer for the sanitation/renovation of a district road.

    Value: € 4.3 Mn

  • Pic Mgmt

    Renovation & Rehabilitation of North South Express Road

    Carried out: Year 2013-14
    Client: KL-Penang Min. of Road & Infrastructure Malaysia

    Task: Rehabilitation of 16 km Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-ST

    Value: € 8.54 Mn

  • Pic Mgmt

    Rehabilitation of North South Express Road

    Carried out: Year 2013-14
    Client: KL-Penang Min. of Road & Infrastructure Malaysia

    Task: Rehabilitation of 3.0 km Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-ST

    Value: € 2.51 Mn

Shamrock GeoScience Range -RCC

A concrete modifier, helps in reduction of required amount of cement, reinforcement and reduce the casting time. Useful for seamless slabs up to 20 meters & more length. Extremely Ideal for beams, columns, runways, tracks or any concrete structures. Helps ductility & flow ability of concrete to pump as well pour through ready mix dispensers.

  • Pic Mgmt

    Ground improvement for new railway tracks at the WSB station in Suhr / Switzerland

    Surface: approx. 3,000 m²
    Carried out: June / July 2009
    Time needed: 2 days
    Milling depth: 30 cm
    Concrete: 180 kg/m²
    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layers for ground improvement for new railway tracks in the county of Aargau

    Value: € 2.6 Mn

  • Pic Mgmt

    Creation of a trans-shipment center for glass recycling in Stuttgart / Germany

    Surface: approx. 3,000 m²
    Carried out: September 2009
    Time needed: 2 days
    Milling depth: 30 cm
    Concrete: 170 kg/m³
    Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for a highly frequented storage area of Rhenus Logistics.

    Value: € 2.8 Mn

  • Pic Mgmt

    Creation of a link road between Cocobeach und Ntoum in Gabun

    Surface: 27 km lenght
    Carried out: July - September 2008
    Time needed: approx. 8 weeks
    Milling depth: 30 cm
    Concrete: 200 kg / m³
    Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the renovation of a link road between two cities.

    Value: € 78.3 Mn

  • Pic Mgmt

    Rehabilitation of a test track for Daimler in Laredo Texas / USA

    Surface: approx. 10,000 m²
    Carried out: May 2004
    Time needed: 2 weeks
    Milling depth: 25 cm
    Concrete: 160 kg / m³
    Task: Renovation of a lane and creation of a Shamrock GeoScience Range base layer.

    Value: € 3.8 Mn

  • Pic Mgmt

    Building of a warehouse in Beek en Donk / NL

    Surface: 2,500 m²
    Carried out: December 2001
    Time needed: 2 days
    Milling depth: up to 70 cm
    Concrete: 220 kg / m³
    Task: Surface foundation to erect a warehouse without individual or strip foundations. Compression of supporting elements directly into the Shamrock GeoScience Range base layer.

    Value: € 0.9 Mn

  • Pic Mgmt

    Construction of a distribution centre in Ostfildern-Scharnhausen / Germany

    Surface: 10,000 m²
    Carried out: December 2000
    Time needed: 2 weeks
    Milling depth: 100 cm (in 3 steps)
    Concrete: 150 kg / m³
    Task: Creation of base and anti-frost layer for the building, the factory floor and the transport routes.

    Value: € 4.2 Mn

  • Pic Mgmt

    Construction of a jetty in Malabo / Equatorial Guinea

    Surface: 60,000 m²
    Carried out: March 2007
    Time needed: 4 weeks
    Milling depth: 40 cm
    Concrete: 180 kg / m³
    Task: Creation of base layer with Shamrock GeoScience Range for the building of a shipping pier with container traffic.

    Value: € 61.6 Mn

  • Pic Mgmt

    Construction of a logistics centre in Wroclaw / Poland

    Surface: 22,000 m²
    Carried out: December 2005
    Time needed: 2 weeks
    Milling depth: 25 cm
    Concrete: 160 kg / m³
    Task: Creation of base and anti-frost layer for the building of shipping halls and traffic areas of a logistics centre.

    Value: € 18.6 Mn

  • Pic Mgmt

    Technology park for LG-PHILIPS in Wroclaw / Poland

    Surface: 79,500 m²
    Carried out: 2006 and 2007
    Time needed: 6 weeks
    Milling depth: 30 - 35 cm
    Concrete: 170 kg / m³
    Task: Creation of a Shamrock GeoScience Range base and antifrost layer for the industrial roads and hall floors of a technology park.

    Value: € 36.5 Mn

  • Pic Mgmt

    Construction of container storage area in Schwieberdingen / Germany

    Surface: approx. 7,500 m²
    Carried out: 2003
    Time needed: 1 week
    Milling depth: 35 cm
    Concrete: 180 kg / m³
    Task: Construction of a Shamrock GeoScience Range base layer with chip seal surface for high bearing loads.

    Value: € 2.3 Mn

  • Pic Mgmt

    Construction on Ampati- Purakhasia District PWD Road

    Carried out: Year 2013-14
    Concrete: 220 kg/m3
    Task: Reconstruction of Weak STP Bridge No. 3/1 and 5/2 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.

    Value: € 0.55 Mn

  • Pic Mgmt

    Construction on Ampati- Purakhasia District PWD Road

    Carried out: Year 2013-14
    Concrete: 190 kg / m³
    Task: Reconstruction of Weak STP Bridge No. 8/3 , 25/3 and 25/5 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.

    Value: € 0.57Mn

  • Pic Mgmt

    Construction on Ampati- Purakhasia District PWD Road

    Carried out: Year 2013-14,
    Concrete: 190 kg/m3
    Task: Reconstruction of Weak STP Bridge No. No. 27/1 , 27/7 and 284 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.

    Value: € 0.84 Mn

Shamrock GeoScience Range -URCC

A concrete modifier for unreinforced concrete, helps in reduction of required amount of cement, reduce the number of dilatation joints and allow the production of large size concrete slabs. Extremely Ideal for all kind of concrete slabs, concrete pavements and precast elements. Helps ductility & flow ability of concrete to pump as well pour through ready mix dispensers.

  • Pic Mgmt

    Creation of concrete areas without reinforcement in Empfingen / Germany

    Surface: approx. 5,000 m²
    Carried out: February 2009
    Time needed: 3 days
    Milling depth: 18 cm
    Concrete: 220 kg / m³ CEM I 42,5
    Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.

    Value: € 2.8 Mn

  • Pic Mgmt

    Creation of concrete areas without reinforcement in Empfingen / Germany

    Surface: approx. 8,000 m²
    Carried out: February 2009
    Time needed: 4 days
    Milling depth: 18 cm
    Concrete: 250 kg / m³ CEM I 42,5
    Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.

    Value: € 2.6 Mn

  • Pic Mgmt

    Creation of a concrete area without reinforcement for heavy load traffic

    Surface: approx. 2,000 m²
    Carried out: February 2008
    Time needed: 1 day
    Milling depth: 18 cm
    Concrete: 170 kg / m³
    Task: Creation of a concrete area without additional reinforcement. Advantage: no expansion joints, no lane grooves.

    Value: € 0.70 Mn

  • Pic Mgmt

    Creation of a wood terminal for Klenk in Baruth near Berlin / Germany

    Surface: A total of 80,000 m²
    Carried out: 2003, 2005 and 2006
    Time needed: 2 weeks for each operation
    Milling depth: 30 cm
    Concrete: 170 kg / m³
    Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the transport and storage area which is used by heavy goods vehicles (axle weight 80 tonnes).

    Value: € 32.6 Mn

  • Pic Mgmt

    Construction of the new BMW branch in Dortmund / Germany

    Surface: approx. 5,000 m²
    Carried out: September 2002
    Time needed: 1 week
    Milling depth: 80 cm (in a sandwich process)
    Concrete: 180 kg / m³
    Task: Saving of pile foundation in the area of the new planned building and conversion of existing backfilling into a base layer.

    Value: € 1.8 Mn

Ecological | Economical | Every Lasting | Shamrock GeoScience Range