Construction of Ampati-Purakhasia Road (28.00 km) under SPA Garohills-Meghalaya
Surface: 1,46,025 m²
Carried out: Oct. 2012
Time needed: 4 Months
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Creation of Aggregate Less District Road of 30cm thick road pavement using Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer.
Value: € 4.57Mn
-
Improvement Including widening to double lane on Songsak Mendipathar Road (from 12th-26 km) East Garo Hills-Meghalaya
Surface: 85,000 m²
Carried out: January 2012
Time needed: 2 Months
Milling depth: 30 cm
Concrete: 170 kg / m³Task: Rehabilitation of old 2 lane state highway pavement using Shamrock GeoScience Range Composite technology as per specifications and directions of PWD Engineer in Charge.
Value: € 1.88 Mn
-
Construction of Road from Betasing to Mellim West-Garo Hills-Meghalaya (15.360 km +3.21 km under SPA)
Surface: 70,500 m²
Carried out: March 2012
Time needed: 3 Months
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Construction of India's First Aggregate Less District Road of 30cm thick road pavement using InfraCrete | Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer under SPA.
Value: € 2.55 Mn
-
Strengthening & Improvement of Riding Quality East Garo Hills-Megahalaya on Songsak-Mendipather (40 km) upgradation
Surface: 82,500 m² under execution
Carried out: October 2014
Time needed: 3 Months
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Creation of Aggregate Less composite pavement as per IRC standards of 30cm thick road pavement using Shamrock GeoScience Range for base and sub-base course including laying of 5 cm thick Asphalt wearing Layer for State PWD under SPA.
Value: € 2.35 Mn
-
Creation of the exterior area of a logistics centre for the Army of Sweden in Arboga
Surface: approx. 90,000 m²
Carried out: June / July 2009
Time needed: ca. 8 weeks
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the creation of the exterior area of a logistics centre.
Value: € 46.10 Mn
-
Rehabilitation of forest paths in Babimost / Poland
Surface: A total of approx. 25,000 m²
Carried out: June 2004
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³Task: Creation of a Shamrock GeoScience Range ST base layer and anti-frost layer for the forest paths used by vehicles transporting wood.
Value: € 24.9 Mn
-
Construction of cycle paths in Suhr / Switzerland
Surface: 22,000 m²
Carried out: 2007
Time needed: 1 week
Milling depth: 25 cm
Concrete: 170 kg / m³Task: Construction of a Shamrock GeoScience Range base and antifrost layer for areas used by cyclists. Created with nearnatural surfaces, without an additional asphalt layer.
Value: € 12.10 Mn
-
Renovation of an agricultural road in Jalan Pekoti Timur / Malaysia
Surface: 11 km
Carried out: August 2006
Time needed: 6 weeks
Milling depth: 30 cm
Concrete: 180 kg / m3Task: Rehabilitation of an agricultural road, which leads through a palm plantation and is used by heavy weight trucks.
Value: € 4.9 Mn
-
Construction of a link road in the county of Biberach a. d. Riss / Germany
Surface: approx. 15,000 m²
Carried out: August 2009
Time needed: 5 days
Milling depth: 40 cm
Concrete: 170 kg / m³Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road in Fischbach / Eberhardzell.
Value: € 6.4 Mn
-
Construction of Kampung Bengang Aggregate Less Road
Carried out: Year 2012-13
Concrete: 220 kg/m3
Client: JKR Sabah Min. of Forest MalaysiaTask: Creation of 11 km District Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-SM
Value: € 6.55 Mn
“Shamrock GeoScience Range Germany, leading Infrastructure Facilitation Company helping National Governments & Global Enterprises to Resource, Reuse, Recycle local soil & materials leaving green prints on roads, bridges, highways, railways, ports, cement, concrete or every user of soil...
Areas of Use
- Road and Motorway construction
- Harbour Premises and Wharfages
- Cycle paths, Forest paths and agricultural roads
- Construction of Runways
- Access routes for the Oil, Gas, Steel and Wood industries
- Dam reinforcements
- General Foundations
- Parking, Container Storage Points and
Logistics Centres
- Tunnel and sewage system construction
- Biogas Plants
- Biogas or other Storage areas
- River Embankment Stabilization
- Slope Reinforcements, Grouting
- Rural or Village Roads
- Storage areas for Wood, Metal, Minerals
- Landfill Sites
- Replacement of Depth Foundations
- Railway tracks
Shamrock GeoScience Range -SM
Unique formulation or miracle product for Soil Modification, any soil type, Soil which has zero or negligible aggregates, leading to complete Solidification. An additive to be mixed in soil by mechanized recycler/ soil stabilizer, even a Ready Mix Cement plant! Tested & tried on more than 5.0 Mn. Sq. Mtrs world over. Lay as per road or pavement design leading to best in class ready to traffic roads. 100% Green Roads!!
Shamrock GeoScience Range -ST
A Stabilizer for recycling of existing roads and rehabilitation of roads infrastructures. This additive modifies the hydration process of cement,where even crushed asphalt pavement can mixed into the new road base. The cement modifier increases the compressive strength and bending-tensile strength, parameters which are responsible for a longer lifetime,less maintenance and cost savings.
-
Road rehabilitation at the NK 107 in the county of Aargau / Switzerland
Surface: approx. 2,500 m²
Carried out: 24. + 25.07.2009
Time needed: 24 hours
Milling depth: 30 cm
Concrete: 180 kg/m³Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.
Value: € 1.9 Mn
-
Creation of a link road between Glina and Topusco / Croatia
Surface: approx. 12 km
Carried out: April / May 2009
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.
Value: € 31.8 Mn
-
Rehabilitation of a link road between two cities in Našièki / Croatia
Surface: approx. 17 km
Carried out: June / July 2009
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 160 kg / m³Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for the renovation of a link road between two cities.
Value: € 52.1 Mn
-
Creation of a highly frequented access road to a quarry in Zimmern / Germany
Surface: approx. 5,000 m²
Carried out: March 2009
Time needed: 2 days
Milling depth: 15 cm
Concrete: 180 kg / m³Task: Creation of a Shamrock GeoScience Range ST base layer with used tarry road construction material for an access road (hundreds of trucks every day).
Value: € 2.6 Mn
-
Operating road for the construction of the new ThyssenKrupp steel mill in Brazil
Surface: approx. 8,000 m²
Carried out: July 2008
Time needed: 1 week
Milling depth: 40 cm
Concrete: 190 kg / m³Task: Creation of an Shamrock GeoScience Range base layer for an operating road which is used by heavy goods vehicles out of faint gritty, silty and clayey sand.
Value: € 3.4 Mn
-
Rehabilitation of a district road in Unterlunkhofen / Switzerland
Surface: approx. 7,500 m²
Carried out: December 2006
Time needed: Milling 2 days, road laying 4 weeks
Milling depth: 25 cm
Concrete: 190 kg / m³Task: Renovation of a link road, which would have taken 8 weeks (at times, completely closed) to complete using conventional building techniques
Value: € 2.8 Mn
-
Rehabilitation of a district road in Osiek / Croatia
Surface: 12,000 m²
Carried out: September 2007
Time needed: 5 days
Milling depth: 30 cm
Concrete: 180 kg / m³Task: Creation of a Shamrock GeoScience Range base and antifrost layer for the sanitation/renovation of a district road.
Value: € 4.3 Mn
-
Renovation & Rehabilitation of North South Express Road
Carried out: Year 2013-14
Client: KL-Penang Min. of Road & Infrastructure Malaysia
Task: Rehabilitation of 16 km Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-ST
Value: € 8.54 Mn
-
Rehabilitation of North South Express Road
Carried out: Year 2013-14
Client: KL-Penang Min. of Road & Infrastructure Malaysia
Task: Rehabilitation of 3.0 km Carriageway for Min. Of Forest Federal Govt. Malaysia using Shamrock GeoScience Range-ST
Value: € 2.51 Mn
Shamrock GeoScience Range -RCC
A concrete modifier, helps in reduction of required amount of cement, reinforcement and reduce the casting time. Useful for seamless slabs up to 20 meters & more length. Extremely Ideal for beams, columns, runways, tracks or any concrete structures. Helps ductility & flow ability of concrete to pump as well pour through ready mix dispensers.
-
Ground improvement for new railway tracks at the WSB station in Suhr / Switzerland
Surface: approx. 3,000 m²
Carried out: June / July 2009
Time needed: 2 days
Milling depth: 30 cm
Concrete: 180 kg/m²
Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layers for ground improvement for new railway tracks in the county of AargauValue: € 2.6 Mn
-
Creation of a trans-shipment center for glass recycling in Stuttgart / Germany
Surface: approx. 3,000 m²
Carried out: September 2009
Time needed: 2 days
Milling depth: 30 cm
Concrete: 170 kg/m³
Task: Creation of a Shamrock GeoScience Range ST base and anti-frost layer for a highly frequented storage area of Rhenus Logistics.Value: € 2.8 Mn
-
Creation of a link road between Cocobeach und Ntoum in Gabun
Surface: 27 km lenght
Carried out: July - September 2008
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 200 kg / m³
Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the renovation of a link road between two cities.Value: € 78.3 Mn
-
Rehabilitation of a test track for Daimler in Laredo Texas / USA
Surface: approx. 10,000 m²
Carried out: May 2004
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³
Task: Renovation of a lane and creation of a Shamrock GeoScience Range base layer.Value: € 3.8 Mn
-
Building of a warehouse in Beek en Donk / NL
Surface: 2,500 m²
Carried out: December 2001
Time needed: 2 days
Milling depth: up to 70 cm
Concrete: 220 kg / m³
Task: Surface foundation to erect a warehouse without individual or strip foundations. Compression of supporting elements directly into the Shamrock GeoScience Range base layer.Value: € 0.9 Mn
-
Construction of a distribution centre in Ostfildern-Scharnhausen / Germany
Surface: 10,000 m²
Carried out: December 2000
Time needed: 2 weeks
Milling depth: 100 cm (in 3 steps)
Concrete: 150 kg / m³
Task: Creation of base and anti-frost layer for the building, the factory floor and the transport routes.Value: € 4.2 Mn
-
Construction of a jetty in Malabo / Equatorial Guinea
Surface: 60,000 m²
Carried out: March 2007
Time needed: 4 weeks
Milling depth: 40 cm
Concrete: 180 kg / m³
Task: Creation of base layer with Shamrock GeoScience Range for the building of a shipping pier with container traffic.Value: € 61.6 Mn
-
Construction of a logistics centre in Wroclaw / Poland
Surface: 22,000 m²
Carried out: December 2005
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³
Task: Creation of base and anti-frost layer for the building of shipping halls and traffic areas of a logistics centre.Value: € 18.6 Mn
-
Technology park for LG-PHILIPS in Wroclaw / Poland
Surface: 79,500 m²
Carried out: 2006 and 2007
Time needed: 6 weeks
Milling depth: 30 - 35 cm
Concrete: 170 kg / m³
Task: Creation of a Shamrock GeoScience Range base and antifrost layer for the industrial roads and hall floors of a technology park.Value: € 36.5 Mn
-
Construction of container storage area in Schwieberdingen / Germany
Surface: approx. 7,500 m²
Carried out: 2003
Time needed: 1 week
Milling depth: 35 cm
Concrete: 180 kg / m³
Task: Construction of a Shamrock GeoScience Range base layer with chip seal surface for high bearing loads.Value: € 2.3 Mn
-
Construction on Ampati- Purakhasia District PWD Road
Carried out: Year 2013-14
Concrete: 220 kg/m3
Task: Reconstruction of Weak STP Bridge No. 3/1 and 5/2 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.Value: € 0.55 Mn
-
Construction on Ampati- Purakhasia District PWD Road
Carried out: Year 2013-14
Concrete: 190 kg / m³
Task: Reconstruction of Weak STP Bridge No. 8/3 , 25/3 and 25/5 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.Value: € 0.57Mn
-
Construction on Ampati- Purakhasia District PWD Road
Carried out: Year 2013-14,
Concrete: 190 kg/m3
Task: Reconstruction of Weak STP Bridge No. No. 27/1 , 27/7 and 284 to permanent double lane RCC Bridge under SPA using Shamrock GeoScience Range RCC techniques.Value: € 0.84 Mn
Shamrock GeoScience Range -URCC
A concrete modifier for unreinforced concrete, helps in reduction of required amount of cement, reduce the number of dilatation joints and allow the production of large size concrete slabs. Extremely Ideal for all kind of concrete slabs, concrete pavements and precast elements. Helps ductility & flow ability of concrete to pump as well pour through ready mix dispensers.
-
Creation of concrete areas without reinforcement in Empfingen / Germany
Surface: approx. 5,000 m²
Carried out: February 2009
Time needed: 3 days
Milling depth: 18 cm
Concrete: 220 kg / m³ CEM I 42,5
Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.Value: € 2.8 Mn
-
Creation of concrete areas without reinforcement in Empfingen / Germany
Surface: approx. 8,000 m²
Carried out: February 2009
Time needed: 4 days
Milling depth: 18 cm
Concrete: 250 kg / m³ CEM I 42,5
Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.Value: € 2.6 Mn
-
Creation of a concrete area without reinforcement for heavy load traffic
Surface: approx. 2,000 m²
Carried out: February 2008
Time needed: 1 day
Milling depth: 18 cm
Concrete: 170 kg / m³
Task: Creation of a concrete area without additional reinforcement. Advantage: no expansion joints, no lane grooves.Value: € 0.70 Mn
-
Creation of a wood terminal for Klenk in Baruth near Berlin / Germany
Surface: A total of 80,000 m²
Carried out: 2003, 2005 and 2006
Time needed: 2 weeks for each operation
Milling depth: 30 cm
Concrete: 170 kg / m³
Task: Creation of a Shamrock GeoScience Range ST base and antifrost layer for the transport and storage area which is used by heavy goods vehicles (axle weight 80 tonnes).Value: € 32.6 Mn
-
Construction of the new BMW branch in Dortmund / Germany
Surface: approx. 5,000 m²
Carried out: September 2002
Time needed: 1 week
Milling depth: 80 cm (in a sandwich process)
Concrete: 180 kg / m³
Task: Saving of pile foundation in the area of the new planned building and conversion of existing backfilling into a base layer.Value: € 1.8 Mn